Wind turbines in fog

The Future of
Compute is Green.

Rent H100s, A100s and RTX 4090s on the first decentralized GPU marketplace powered exclusively by verified renewable energy. Deploy in 90 seconds. Pay by the minute.

From $0.39/GPU/hr90-second cold start100% verified renewable
42.8k
Active GPUs on Network
100%
Renewable Energy Verified
1.2M
Tons CO₂ Offset Annually
90s
Avg Cold Start Time
Transparent Pricing

Rent GPUs by the Minute

Browse available hardware across our verified green facilities. Pay only for what you use, with no commitments.

One-Click Deploy

Popular Models, Pre-configured

Skip the setup. Pick a model, we handle the wrapper, GPU sizing, and runtime.

For AI Innovators & Investors

ESG-Compliant AI Scaling

Access massive distributed compute power without compromising corporate sustainability mandates. Every FLOP is cryptographically tied to green energy generation.

  • SEC/EU compliant carbon reporting
  • SOC2 Type II Secure Enclaves
  • Up to 60% cheaper than AWS/GCP
For Compute Providers

Turn Surplus Energy into TAO

Monetize stranded renewable energy. Our customized Bittensor subnet offers premium reward multipliers for nodes verified by our on-chain green oracle.

  • 1.5x Multiplier for Tier 1 renewables
  • Automated Payouts via smart contract
  • Support for H100, A100, and RTX 4090 clusters
On-Chain Oracle

Verified by Nature

Our network integrates directly with grid APIs and smart meters to ensure every compute cycle is matched with clean energy production.

Hydroelectric dam
Nordic Hydro Cluster Alpha
Iceland · 24,000 GPUs
Verified
Solar farm
Desert Sun Array
Nevada, USA
Geothermal
GeoCore Station
New Zealand

Running a renewable-powered GPU site?

Get your facility verified by our on-chain oracle and start earning TAO with a 1.5x green multiplier.

Get Verified & Start Earning
Miner Revenue

Calculate Your Yield

Estimate your monthly earnings based on hardware contribution. Green verified nodes receive emission priority.

1x RTX 4090128x H100s
Hardware Profile: 8x A100 Cluster
Estimated Monthly Reward
14.2 τ
Includes 1.5x Green Multiplier
Get Started in Minutes

Two Paths, One Network

Whether you're building AI products or running renewable-powered hardware — three steps, and you're live.

For Renters

Launch a Model in 90 Seconds

  1. 01
    Sign up

    Free account, $5 minimum top-up to start. Stripe, USDT, USDC, or TAO.

  2. 02
    Pick a GPU or model

    Browse H100s to RTX 4090s, or one-click deploy Llama, SDXL, FLUX.

  3. 03
    Deploy and pay-per-minute

    OpenAI-compatible endpoint or SSH access. Shut down any time.

Start renting →
For Miners

Monetize Your Green Energy

  1. 01
    Register hardware

    Connect RTX 4090, A100, or H100 clusters to our Bittensor subnet.

  2. 02
    Verify green energy

    Submit grid API credentials or smart meter data to our on-chain oracle.

  3. 03
    Earn TAO + rental fees

    1.5× green multiplier. Automatic payouts every epoch via smart contract.

Apply as provider →
Trusted by Industry Leaders

What Miners & Users Say

“Cut our inference bill by 62% switching from AWS. The CLI is as fast as RunPod's, and I can tell my team we're actually running on hydro — not just offsetting after the fact.”
Priya Desai
Priya Desai
Founding Engineer, Scout Labs
✓ 62% bill reduction✓ 47s cold start
“As an investor, I needed a compute solution that wouldn't become a PR liability. Green Compute's verification rigor gives us confidence to scale aggressively.”
James Whitmore
James Whitmore
Partner, Sequoia Climate Fund
✓ Series B lead✓ ESG compliant
Building the Future

Roadmap & Milestones

Q4 2023

Testnet Launch

Initial subnet deployment on Bittensor with 12 verified miners. Core inference API operational.

Q1 2024

Green Oracle V1

On-chain energy verification system deployed. Smart meter integrations with 4 grid operators.

Q3 2024

Mainnet Migration

Full production launch with 1000+ GPU target. SOC2 Type II certification complete.

In Progress
Q4 2024

GPU Rental Market

Bare-metal rental capabilities launch. Support for training workloads and custom containers.

Q1 2025

Carbon Credit Integration

Verified compute providers can claim tradable carbon offset tokens. Enterprise ESG dashboard.

Built for Developers

Deploy from your terminal

A thin CLI, an OpenAI-compatible API, and one-line deploys. No console clicking — ship straight from your pipeline.

  • OpenAI-compatible /v1/chat/completions endpoint
  • Python SDK + REST API (no vendor lock-in)
  • Per-minute billing, no minimum commitment
Get API Key
green-compute
$ pip install green-compute
$ gc deploy meta-llama/Llama-3.1-8B-Instruct
  ✓ matched H100 provider in Iceland (hydro)
  ✓ pulling vllm/vllm-openai:v0.8.5
  ✓ model loaded in 47s
https://api.green-compute.com/v1/chat/completions
$ curl -X POST $ENDPOINT \
    -H "Authorization: Bearer $GC_KEY" \
    -d '{"messages":[{"role":"user","content":"hi"}]}'
Enterprise-Grade

Security & Compliance

Built from the ground up with institutional requirements in mind. Our infrastructure meets the highest standards for financial and healthcare workloads.

SOC 2 Type II
Certified
ISO 27001
Compliant
RE100
Verified Member
GDPR
Data Privacy
Secure Enclave ActiveTEE-0x9af3…e21d
Workloads in TEE
128,430
Attestation Success
99.998%
Keys Rotated (last 24h)
3,214
  • Remote attestation verified each epoch
  • Private inference — prompts never leave enclave
  • Hardware-rooted trust chain

Ready to build on clean compute?

Join hundreds of builders, miners and investors already on Green Compute.