Wind turbines in fog

The best clean inference
on the market runs on cow shit.

Biogas, solar, hydro, wind, geothermal — if you can prove your power is clean and meet the technical requirements you can mine on Subnet 110. First wave: UK farms running RTX 4090s and RTX 5090s on biogas.

From $0.40/GPU/hrSubnet 110OpenAI-compatible API
110
Bittensor Subnet
UK
Biogas Miners First
2
SKUs: 4090 + 5090
API
OpenAI-Compatible
Transparent Pricing

Rent GPUs by the Minute

Browse available hardware across our verified green facilities. Pay only for what you use, with no commitments.

* Indicative starting rates. Final prices are set by individual verified providers and update in real time on the rental dashboard.

One-Click Deploy

Popular Models, Pre-configured

Skip the setup. Pick a model, we handle the wrapper, GPU sizing, and runtime.

Three Ways In

Pick your side of subnet 110

Enterprise buyers, eco-compute providers, and stakers — each of them benefits from the same flywheel: real inference demand, clean electrons, and revenue-backed alpha.

On-Chain Oracle

Verified by Nature

Every miner on subnet 110 proves their power is green before a single token gets paid. Biogas leads. Solar, hydro, wind, and geothermal are welcome alongside.

Anaerobic digester biogas plant — large tanks on a farm
UK Biogas Network
On-farm anaerobic digesters · First-wave miners
Verified
Solar farm
Solar, hydro & wind
Globally eligible · Attest & earn
Geothermal facility — industrial steam plumes
Geothermal
Baseload clean power welcome

Running a renewable-powered GPU site?

If you would like to become a miner please apply here.

Apply to mine
Get Started in Minutes

Two Paths, One Network

Whether you're building AI products or running renewable-powered hardware — three steps, and you're live.

For Renters

Launch a Model in 90 Seconds

  1. 01
    Sign up

    Free account, $5 minimum top-up to start. Stripe, USDT, USDC, or TAO.

  2. 02
    Pick a GPU or model

    RTX 4090 or 5090 per GPU, or one-click deploy Llama, SDXL, FLUX.

  3. 03
    Deploy and pay-per-minute

    OpenAI-compatible endpoint or SSH access. Shut down any time.

Start renting →
For Miners

Monetize Your Green Energy

  1. 01
    Verify green energy

    Biogas, solar, hydro, wind, or geothermal — attest via carbon-registry + hardware-location proofs.

  2. 02
    Register hardware

    Once verified, connect RTX 4090 or RTX 5090 nodes to Bittensor subnet 110.

  3. 03
    Earn TAO + rental fees

    Serve real inference demand. Validators score you. Payouts every epoch, no proof no payout.

Apply as provider →
Building the Future

Roadmap & Milestones

Feb 2026

Testnet launch

First biogas-verified miners live on testnet. Rental + inference architecture complete. Website integration shipped.

Apr 2026

Mainnet on subnet 110

Production launch. First enterprise inference traffic flowing through verified-green miners on Bittensor subnet 110.

Live
Jun 2026

Major revenue milestone

Generated over $82,000 in profitable revenue in the first month of Bittensor operations.

Jun 2026

First buyback completed

$8,200 USD (37 TAO) buyback using 10% of contract revenue, locked in treasury. We share the public wallet for transparency: 5D2UXtzXhP2YCgreodgrGMs2niVZWv2Xt7cxJwYWioU6hdTH

Jun 2026

Partnership with Vocence (@vocence_bt, SN78)

Our first compute partnership to grow reach, strengthen the community, and accelerate the adoption of SN110 across Bittensor — we are building the future together.

Next

Speaking at 'Inside Bittensor', London

Speaking at the 'Inside Bittensor' event in London on July 1st — sharing our vision for inference, green compute deployments, and opportunities in AI infrastructure.

Next

New infrastructure & UK 5090 cluster

Significant behind-the-scenes progress across new infrastructure, partnerships, and deployments (some not yet public; a new site/deployment is expected in ~2 months). Multiple nodes of NVIDIA RTX 5090s are coming online at an existing site over the coming months, creating one of the largest clusters of this node type in the UK.

Next

GPU rental marketplace scale-out

More 4090/5090 capacity online. Per-provider pricing and custom workloads open up to the rental side.

Next

More green-energy miners

Onboard solar, hydro, wind, and geothermal operators alongside UK biogas. Global certified-miner network.

Later

Carbon-credit integration

Hook verified compute into carbon-credit registries so enterprise buyers can claim the offset alongside the inference.

Built for Developers

Deploy from your terminal

A thin CLI, an OpenAI-compatible API, and one-line deploys. No console clicking — ship straight from your pipeline.

  • OpenAI-compatible /v1/chat/completions endpoint
  • Python SDK + REST API (no vendor lock-in)
  • Per-minute billing, no minimum commitment
Get API Key
green-compute
$ pip install green-compute
$ gc deploy meta-llama/Llama-3.1-8B-Instruct
  ✓ matched RTX 4090 provider in the UK (biogas)
  ✓ pulling vllm/vllm-openai:v0.8.5
  ✓ model loaded in 47s
https://api.green-compute.com/v1/chat/completions
$ curl -X POST $ENDPOINT \
    -H "Authorization: Bearer $GC_KEY" \
    -d '{"messages":[{"role":"user","content":"hi"}]}'

Ready to build on clean compute?

Join the waitlist to discover Green Compute for yourself.